← All episodes

The Human in the Loop · Ep. 1 · October 4, 2026 · 23:11

How Much Compute Does AI Need?

One workout. One big question. In 2023, the computers running AI in the US drew about 3 gigawatts of power. By the end of 2026, it's about 28. How much computing power does the world have for AI, and how much more will we need?

The Professor and Loop, an AI co-host, walk through it in one 23-minute workout. By the end you'll know four things. What a gigawatt of compute is. Who owns it. How fast it grew. And how much more is coming, plus what could stop it.

Scripts are drafted with AI help, then fact-checked and edited by a human. The voices and art are made with generative AI. How this show is made

Chapters

  1. 0:00 Cold open: the stat of the day
  2. 1:41 Warm-up: what a gigawatt of compute is
  3. 6:11 Build: how fast it grew
  4. 9:43 Halfway recap
  5. 10:05 Push: the four walls and the debates
  6. 18:06 Ease off: four signals to watch
  7. 22:01 Cool-down: four for four

Sources

Every number in the episode is checked against its source. They are listed in the order the episode uses them.

Warm-up

  • Lawrence Berkeley National Laboratory, 2024 US Data Center Energy Usage Report (Dec 2024)
  • International Energy Agency, Energy and AI (2025)
  • Dylan Patel on the Dwarkesh Podcast (Aug 2026)

Build

  • SemiAnalysis US AI power estimates and 100,000 H100 Clusters (Jun 2024)
  • Epoch AI, Training compute of frontier AI models grows by 4 to 5x per year (May 2024)
  • Epoch AI, How much power will frontier AI training demand in 2030? (Aug 2025)
  • Leopold Aschenbrenner, Situational Awareness (Jun 2024)
  • xAI Colossus 2 announcement (Jan 2026)

Push

  • TSMC, SEMICON Taiwan remarks (Sep 2023) and earnings calls (Jan and Jul 2026)
  • Dominion Energy via Bloomberg (Aug 2024)
  • Micron earnings calls (Mar 2024, Sep 2026). SK Hynix via Seoul Economic Daily (Feb 2026)
  • TrendForce DRAM pricing (Feb, Jun and Aug 2026). Apple fiscal Q3 2026 call (Jul 2026)
  • Cleanview, Behind-the-meter data centers report (2026)
  • GE Vernova Q2 2026 results and Utility Dive (Jul 2026)
  • NVIDIA DGX H100 specs, Uptime Institute (2025), EIA Short-Term Energy Outlook (Sep 2026), Silicon Data H100 index (Oct 2026)
  • Epoch AI, Can AI Scaling Continue Through 2030? (Aug 2024)
  • NERC 2025 Long-Term Reliability Assessment (Jan 2026)
  • PJM capacity auctions and PJM Independent Market Monitor via Utility Dive (Jul 2026). AEP Ohio bill notice (2025)
  • Gallup (May 2026). Heatmap News (Jul 2026)
  • SemiAnalysis, Everyone Says Datacenter Moratoriums Are Killing the US Buildout (Sep 2026)
  • Bloomberg via Insurance Journal (Jul 2026). Associated Builders and Contractors (Jan 2026)
  • Crusoe (Feb 2026). Texas Tribune (Apr 2026). McKinsey (Aug 2025)
  • ASML 2025 Annual Report and Q2 2026 call. Reuters citing JPMorgan (Sep 2026)
  • Dylan Patel on the Dwarkesh Podcast (Mar 2026)
  • Goldman Sachs Research (Feb 2025)

Ease off

  • Amazon, Alphabet, Microsoft and Meta Q2 2026 results (Jul 2026). Financial Times via Tom's Hardware (Apr 2026)
  • ASML and TSMC investor calendars. TrendForce (Sep 2026)
  • PJM 2028/29 Base Residual Auction report (Jul 2026)
  • NBC News Decision Desk poll (Sep 2026)
  • New Jersey S-731/A-796 (Jul 2026). California SB 886 (Sep 2026)
  • BLS Occupational Outlook Handbook, Electricians
  • NVIDIA Vera Rubin announcement (Jul 2026)

Transcript

Read the full transcript

Machine transcribed from the finished episode, with names and numbers corrected. The Professor and Loop alternate, and speakers are not labeled.

Okay, Professor, are you ready for the stat of the day to start off? Let me have it, Loop. In 2023, all the computers running AI in the United States drew about 3 gigawatts of power. Okay. By the end of this year, about 28. Wait, 28?

That's almost 10 times. In three years. And next year, the US is on track to add something like 38 more. Hang on, where's that number from? Analyst firms that track data center construction. SemiAnalysis is the main one.

I'll check it against energy researchers later in the episode. Good. A number that big deserves a second source. Noted. Second source is on the list. So here's what we're tackling today.

How much computing power does the world have for AI? And how much more are we going to need? I'm Loop. I'm an AI. And I did the reading. And I'm the Professor.

As you might imagine, we're pretty intrigued by what generative AI can do. And we lean on it to build this show. In every part of it. Research, scripts, voices, visuals. And we're not shy about that. What matters is the result.

Accurate, useful, and worth your time. The idea is simple. One episode, one workout. About 25 minutes. So you don't have to hunt for the right podcast every morning. We hope you're at least walking.

Treadmill. Running. Biking. Even better. By the end of this workout, you'll know four things. What a gigawatt of compute actually is, who owns it, how fast it grew, and how much more is coming.

Plus, what could stop it? Four things. One workout. Let's warm up with the basics. Okay, Loop, warm up time. What are we covering in this first stretch?

The basics. By the end of this segment, you'll know what compute actually is and why the industry measures it in gigawatts. Plus, who owns it? Good, I'll play the person who knows nothing. When people say compute, what do they mean? The raw number crunching that AI runs on.

Every time you ask a chatbot a question, specialized chips do billions of tiny multiplications to produce each word of the answer. And those chips are the GPUs everyone talks about. Mostly. GPU stands for graphics processing unit. They were built for video games, which need lots of simple math done at the same time. That turned out to be exactly what AI needs.

NVIDIA makes most of them. Google and Amazon also designed their own. So where do these chips live? Not in my laptop, I'm guessing. In data centers. Picture a warehouse the size of several football fields, rows of racks, each about the size of a refrigerator packed with chips.

The newest racks draw more than a hundred kilowatts each. A hundred kilowatts for one refrigerator sized box. Roughly what 80 homes draw on an average day. Huh, okay. That explains the unit I keep hearing, gigawatts. Why do we measure computers and power?

Because power is the most honest way to count them. Chips keep getting faster. So counting chips gets confusing. But every chip has to be plugged in and cooled. So the industry counts capacity by how much electricity the buildings can draw. Give me a feel for a gigawatt.

A billion watts. Roughly the output of one large nuclear reactor. Enough to power about 800,000 American homes. Hang on, where's that homes number from? Simple math. An average American home uses about 1200 watts around the clock.

Divide a billion by 1200 and you get a little over 800,000. Okay, I'll allow it. So how much of the country's electricity goes to data centers right now? The best public count comes from Lawrence Berkeley National Lab in a report for the Department of Energy in December, 2024. Data centers used about 4.4% of all US electricity in 2023. That's less than I expected.

It's the direction that matters. The same report projects somewhere between about seven and 12% by 2028. So it could nearly triple in five years. At the high end, yes. And globally, the International Energy Agency counted about 415 terawatt hours for data centers in 2024. They expect that to more than double by 2030.

That's a bit more electricity than all of Japan uses today. All of Japan, okay. So who actually owns all this? Think of four groups. First, the cloud giants. Amazon, Microsoft, Google, Meta, and Oracle.

They build most of the buildings and rent out the computers. The landlords. Second, the AI labs. OpenAI, Anthropic, Google DeepMind, and xAI. They're the biggest tenants. They train the models and sell the answers.

Third, the Neo Clouds. Newer companies like CoreWeave, Crusoe, and Nebius. Several started as crypto miners. They move faster than the giants and rent mostly to the labs. And the fourth group makes the actual hardware. The supply chain.

NVIDIA designs most of the chips. TSMC in Taiwan manufactures almost all of them. And a few memory makers supply the rest. There's no quick substitute for any of them. That sounds like a lot of single points of failure. It is.

We'll come back to that in the push segment. Last basic question. What is all this compute actually doing? Two jobs, training and inference. Training is teaching a model over weeks or months. Inference is using it, answering your question, writing your code.

Which one uses more? The analyst Dylan Patel of SemiAnalysis estimated this August that a big lab spends about half its compute on research, about 10% on final training runs, and about 40% serving customers. So serving customers isn't even the biggest slice. Not by his count. His argument is that building the next model is worth more than selling the current one. All right, so now you know.

One gigawatt is about one nuclear reactor or 800,000 homes. That's the number to remember. Next, the build. How fast we got from a few gigawatts to dozens and which forecasts held up. Okay, we're warmed up. Loop, what's this stretch about?

The build, how fast we got here and which predictions held up. By the end, you'll know the growth rate and one forecast that landed almost exactly on time. Start me in 2023. In 2023, all the AI computers in the US drew about three gigawatts. That's the count from SemiAnalysis, an industry research firm. By the end of this year, about 28.

Right, our stat of the day. Why so fast? Because the models keep getting bigger. Epoch AI, a research group that tracks this, found that the computing used to train the top models grew four to five times every year, from 2010 to 2024. Four to five times, every year. Every year.

Over five years, that compounds to roughly a thousand times. Hang on, a thousand? Check that. Four, multiplied by itself five times is about a thousand. Five, multiplied by itself five times, is over 3,000, so a thousand is the low end. Okay, so the chips got faster, but the appetite grew faster.

Much faster. Chips get roughly a quarter to 40% more efficient each year by Epoch's estimate. Demand grows four to five times, so the power bill keeps climbing. Give me a concrete picture. What did the biggest single cluster look like two years ago? In 2024, the frontier was about 100,000 of NVIDIA's H100 chips wired together in one place.

SemiAnalysis put a cluster like that at about 150 megawatts and roughly $4 billion. And now? In January, xAI said its Colossus 2 cluster was running and called it the first gigawatt training cluster in the world. That's the company's own claim, though. Right, it's their number, but it fits the trend. From 150 megawatts to about a thousand in under two years.

So did anyone see this coming? One person did, pretty closely. In June 2024, a former OpenAI researcher named Leopold Aschenbrenner published an essay series called Situational Awareness. It included a simple table. Walk me through it. About 100 megawatts for the biggest cluster in 2024.

About one gigawatt by 2026, 10 gigawatts by 2028, and 100 by 2030. And this year was one gigawatt. Which is about what showed up. His 2024 and 2026 marks landed close to on time. That's impressive. What about the rest of his table?

Still open. 100 gigawatts by 2030 would be more than a fifth of all US electricity production by his own math. That one, I'll believe when I see it. Epoch AI is more cautious. Last year, they projected the largest single training run in 2030 at somewhere between four and 16 gigawatts. So the forecasters agree on the direction and argue about how steep.

That's a fair summary. And companies are planning as if the steep version is real. Dylan Patel of SemiAnalysis estimated this August that OpenAI and Anthropic each started this year near two gigawatts and will end it above five. Each of them, more than doubling in one year. And next year, the US as a whole is on track to add something like 38 more. All right, so now you know.

The compute behind the biggest models has grown about four to five times a year. And the gigawatt cluster showed up right when one forecaster said it would. Number to remember, four to five times a year. That's the pace. And we're halfway there. Quick recap for a tired brain.

Two numbers so far. One gigawatt is about one nuclear reactor, or 800,000 homes. And the compute grows about four to five times a year. Reactor sized and multiplying. Got it. Up next, the push.

What's actually slowing all this down and where the experts disagree? Okay, last push. Loop, what's this stretch about? The brakes. What's actually slowing the build out down and where the experts disagree? By the end, you'll know the four walls and the one machine every advanced chip has to pass through.

Four walls. Start with the obvious one, power. Here's the twist. Power isn't the only wall anymore. The bottleneck keeps moving. Moving how?

In 2023, the chairman of TSMC, the company that makes most advanced chips, said the shortage wasn't the chips at all. It was the packaging. The step that joins the chip to its memory. Okay. By 2024, it was power. Dominion Energy told data centers in Virginia that a grid hookup could take up to seven years.

And this year, back to chips and memory. So every time they fix one, the next one shows up. That's the pattern. Each fix exposes the next constraint. Okay, wall one, chips. TSMC in Taiwan makes the vast majority of the world's most advanced chips.

In January, its CEO, C.C. Wei, put it simply. The capacity is very tight. And since then? Tighter. In July, he said packaging is so tight it's limiting his customer's growth.

TSMC raised its spending plan for this year to $60 to $64 billion. So what happens to everybody else? My phone, my laptop? That's wall two. Memory. AI chips use a special stacked memory called HBM.

Micron's CEO said it takes about three times the factory output of regular memory to make the same number of bits. So the AI chips eat the memory supply. And prices jumped. TrendForce, a firm that tracks chip prices, found regular memory contract prices nearly doubled in the first three months of this year. That was on top of a jump of about half the quarter before. Doubled.

In one quarter. In one quarter. TrendForce estimates memory went from about a 10th of an iPhone's parts cost to about a third. Tim Cook called it a hundred year flood on memory pricing. When does that ease up? Not soon.

Micron's new Idaho factory starts making chips in mid-2027 and a second one in late 2028. SK Hynix's new plant in Korea opens in early 2027. Okay, back to power. You said it's not the only wall anymore. Because the industry found a workaround. If the grid can't hook you up, you build your own gas plant next door.

The industry calls that behind the meter. Is that actually happening? On paper, a lot. Cleanview, a firm that tracks energy projects, counted about 90 gigawatts of onsite power announced for US data centers. But only about two gigawatts of it is actually running. 90 announced.

Two running. That's a big gap. And the equipment is backed up. GE Vernova, one of the biggest gas turbine makers, is already taking reservations for turbines delivered in 2031. 2031. So if power is that hard, why do the labs keep paying for it?

Because it's cheap next to the chips. Here's our own math. A top NVIDIA chip, with its share of the server and cooling, draws about one and a half to two kilowatts. At the average US industrial power price, that's about 15 cents an hour. And renting that chip costs? About $2.75 an hour by Silicon Data's rental index.

So even if power doubled, the bill goes up five or 6%. So for the labs, power is almost a rounding error. For the labs, yes. But here's the first debate. Epoch AI, the research group from the last segment, studied this in 2024. They named power and chip making as the two limits most likely to bite by 2030.

So the cost is fine. The question is whether the power exists. Right, and the grid watchdogs are worried. NERC, which oversees grid reliability in North America, flagged five regions as high risk by 2030. That includes Texas and the big Mid-Atlantic. And who pays for the grid part?

That's the political side. PJM runs that mid-Atlantic grid for 13 states and DC. In 2024, its price for reserve power capacity jumped about nine-fold, and it's sat at the cap ever since. Its independent market monitor blames data centers for about 46% of those costs over the last four auctions. And people feel that. In Ohio, AEP said generation charges rose about $27 a month for a typical home in June 2025.

That's not great. Are people turning on these things? Fast. This spring, Gallup found 71% of Americans oppose an AI data center in their area. That's more than oppose a nuclear plant nearby. More than nuclear?

Wow. And towns are acting. Heatmap News counted over 530 local laws restricting or banning data centers. Most passed this year. And more than 50 projects canceled in 2026 after local pushback. So the backlash is winning?

That's the second debate. SemiAnalysis, an industry research firm, checked the project sites in those areas in September. They found only about 8% of the capacity truly delayed. So loud, but not stopping much. Yet. Yet is doing a lot of work there.

It is. It matters if the bans get wider and stricter. Okay. Chips, memory, power. What's wall four? People.

Electricians especially. The head of the Builders Trade Group told Bloomberg that electrical work is about half the labor on a data center project. And there aren't enough of them. That group, Associated Builders and Contractors, says US construction needs about 350,000 new workers this year. And over 450,000 next year. Give me one site.

Abilene, Texas. The first Stargate campus, built for OpenAI. Crusoe, the developer, has had thousands of construction workers there every day. Its CEO put it near 7,000. The Texas Tribune found electricians on that site earning about $35 an hour. One local home builder was paying around 20.

And their houses now take two months longer to finish. So the data center eats the town's electricians. How do you get around that? Build more of it in factories. Walls, power rooms and cooling units arrive prebuilt and get bolted together on site. McKinsey says the leading builders now prefab up to 85% of the parts.

OK, so which wall wins in the end? Go all the way down the supply chain. To one Dutch company, ASML. By its own account, it's the only company in the world that makes EUV machines. Those are what print the most advanced chips. How many of those does it make?

65 of its main model this year, according to its finance chief. Around $200 million each. ASML plans about 30% more next year. And JPMorgan says it's looking at over 110 in 2028. So that's the real ceiling. For some analysts, yes.

Dylan Patel of SemiAnalysis figures those machines could support about 200 gigawatts of AI chips a year by 2030. 200 a year. Remember Aschenbrenner's 100 gigawatt cluster? That would eat half a year's supply. But the forecasters aren't close to that. Goldman Sachs expects all the world's data centers combined to draw about 120 gigawatts in 2030.

And Epoch puts the biggest single training run at 4 to 16. Huh. So the experts agree there's a ceiling, and argue about where the room gets tight first. That's a fair summary. Alright, so now you know. The limit keeps moving.

This year, it's chips and memory. Power is a fight over speed and who pays. And the people to build it are running short. Number to remember. 65. That's about how many of ASML's main chip printing machines get built this year.

Every advanced AI chip is printed on one of them. That's the push. Up next, we ease off. What to watch over the next year. All right, we're easing off. Loop, what's this stretch?

The watch list. Four signals to follow over the next year, so you can tell for yourself whether the build out is speeding up or hitting a wall. Four signals, go. Signal one, the money. In July, the four biggest spenders updated their plans for this year. Amazon said about $220 billion.

Alphabet, around 200 billion. Microsoft, about 175, after an accounting change. Meta, up to 145. Tie that up for me. Here's our own math. About $740 billion, close to three quarters of a trillion in one year.

The Financial Times put last year's total at about 410 billion. So, almost double. Close to it. They all report again at the end of October. Watch whether anyone puts a number on 2027. Anybody hinting?

Amazon CEO, Andy Jassy, said most of its capacity for 2027 is already reserved. Meta says it isn't giving a 2027 number yet. So, the customers are lined up before the buildings are done. For now. Signal two, chips and memory. Mid-October is a big week.

ASML reports on the 14th. TSMC on the 15th. What am I listening for? For ASML, whether it sticks to that 30% jump in machines next year. For TSMC, whether packaging is still tight. And memory?

My laptop is nervous. Fair. TrendForce expects regular memory prices to climb another 10 to 15% this quarter. Real relief waits for Micron's Idaho factory, expected in mid-2027. So, no cheap memory before then. Probably not.

Signal three, power. PJM, the Mid-Atlantic grid, held its latest capacity auction in July. The price hit the cap again. And for the second auction in a row, the grid came up short of what it needs to stay reliable. Short, not just expensive. Short, by about 6,800 megawatts.

The next auction is in December. Watch the price and watch the gap. And the gas plants next door? 90 gigawatts announced, two running? That's the other one to watch. Does that two start to climb?

Okay, signal four? Politics. The midterms are November 3rd. In September, an NBC News poll found 69% of voters oppose an AI data center in their area. Republicans and Democrats both. So, candidates are running against them.

Some are. And states are changing the rules. In July, New Jersey ordered its regulators to set special rates so big data centers cover their own costs. California passed its own version in September. So, the who pays fight from the last segment is turning into law. Right.

Watch how many states follow. Is there any good news in all this? Two pieces. First, jobs. The Bureau of Labor Statistics expects about 73,000 openings for electricians every year over the next decade. It names data centers as one reason.

So, if you know someone thinking about a trade. Electrician looks like a good bet. Second, efficiency. NVIDIA's next platform, Vera Rubin, started shipping in July. NVIDIA claims up to 10 times the work per watt for running AI models. 10 times?

So, we'd need less power? That's the catch. When something gets cheaper, people often use a lot more of it. So, total use goes up. Economists call that the Jevons paradox. Whether it holds for AI is one more thing to watch.

Okay, so now you know. Chips and memory in mid-October. The money at the end of October. The voters in November. And the grid in December. Number to remember.

Three quarters of a trillion dollars. That's roughly what four companies plan to spend this year. Mostly on AI build out. Three quarters of a trillion. Okay, cooling down. At the top, we said you'd know four things.

Let's check them off. One, what's a gigawatt? About one nuclear reactor's worth of power. Enough for roughly 800,000 homes. It's how the industry counts compute now. Check.

Two, who owns it? The cloud landlords, the AI labs, and the Neoclouds. With a supply chain underneath them all. Check. Three, how fast did it grow? US AI power went from about three gigawatts in 2023 to about 28 this year.

And the compute used to train top models grows four to five times a year. Check. Four, how much more is coming? And what could stop it? A lot more. Goldman Sachs expects about 120 gigawatts of data centers worldwide by 2030.

The walls are chips, memory, power, and people. And under all of it, about 65 machines a year. Four for four, good workout. Next time, we follow that three quarters of a trillion. Who's actually making money from AI? And who's still waiting?

Grab some water. I'm the Professor. And I'm Loop. See you next workout.